πŸ“‹ Template ISO 27001:2022 Β· Clause 6.1.2 Β· 5 pages Β· ISMS-RR-001

Risk Register

Live risk register with 15 pre-populated examples covering common cybersecurity risks with owners, scores, treatment decisions, and residual risk dashboard.

πŸ“§ Business Email Required

Verify Your Email to Access

Enter your business email to receive a one-time code. Verified once β€” access all 17 templates.

Go to Templates Library

Already verified? Your access should be automatic on this device.

Document ID: ISMS-RISK-001 | Version: 1.0 | Date: March 2026 | Classification: Internal | Owner: Information Security Manager

Introduction

This register records all identified information security risks for [Organisation Name]’s ISMS scope. Each risk is assessed using the methodology defined in the Risk Assessment Methodology (ISMS-METH-001). The register is a living document β€” risk owners are responsible for updating treatment status, and the ISM is responsible for reviewing the full register at least quarterly and formally at the annual Management Review.

How to read this register:

  • Likelihood and Impact are scored 1–5 per the scales in ISMS-METH-001.
  • Risk Score = Likelihood Γ— Impact. Scores 1–4 = Low, 5–9 = Medium, 10–14 = High, 15–25 = Critical.
  • Residual Score reflects the expected score after treatment controls are fully implemented.
  • Status: Planned = not yet started | In Progress = controls being implemented | Complete = controls implemented and verified.

Risk Register

ID Asset Threat Vulnerability Likelihood Impact Risk Score Rating Treatment Control Owner Target Date Residual Score Status
R-001 Client SIEM data Ransomware encryption of SOC platform and client log data Unpatched systems in SOC platform; no offline backup copy 4 5 20 Critical Mitigate: enforce patching SLA less than 30 days for critical CVEs; implement daily backups with offline/immutable copy; test restore monthly SOC Manager 2026-04-30 8 In Progress
R-002 Employee credentials (Microsoft 365) Phishing attack leading to account takeover and data access No MFA enforced on Microsoft 365; all accounts use password only 5 4 20 Critical Mitigate: enforce MFA via Entra ID Conditional Access for all users; block legacy authentication protocols IT Manager 2026-03-31 4 Complete
R-003 AWS production environment Misconfiguration leading to public exposure of client data (e.g., public S3 bucket, open security group) No automated configuration scanning; manual reviews inconsistent 3 5 15 Critical Mitigate: deploy AWS Config and Security Hub with managed rule sets; implement automated remediation for critical findings; quarterly manual review Cloud Lead 2026-04-15 6 In Progress
R-004 Penetration testing tooling (offensive lab) Insider misuse of offensive tools for unauthorised activity or data exfiltration No controls on lab network egress; no logging of tool execution; shared tool accounts 2 5 10 High Mitigate: implement network segmentation with egress filtering on lab VLAN; deploy tool usage logging to SIEM; individual named accounts for all tools; annual background checks for lab staff Technical Director 2026-05-31 4 Planned
R-005 Client report archive (SharePoint) Unauthorised disclosure of penetration test reports to unauthorised parties Shared drive with overly broad group permissions; no access review process 3 4 12 High Mitigate: implement role-based access with named individuals only; remove group-level permissions; conduct quarterly access review ISM 2026-03-31 3 Complete
R-006 HR and payroll SaaS system Data breach of employee PII (names, salaries, bank details, addresses) Third-party SaaS enforces weak password policy; no SSO integration; no MFA 3 4 12 High Mitigate: enforce SSO via Entra ID; enable MFA requirement in vendor admin console; conduct annual supplier security review including questionnaire HR Manager 2026-04-30 4 In Progress
R-007 Server room (on-premises lab hardware) Physical theft of servers or storage containing client or operational data No CCTV coverage of server room door or interior; door access uses standard key lock only 2 4 8 Medium Mitigate: install CCTV covering server room entrance and interior; upgrade door access to badge + PIN with access log retention; review access list quarterly Facilities Manager 2026-06-30 3 Planned
R-008 Corporate email / finance processes Business Email Compromise (BEC / CEO fraud) leading to fraudulent wire transfers No DMARC enforcement (policy set to none); no dual-approval procedure for wire transfers 4 4 16 Critical Mitigate: set DMARC policy to reject for all domains; implement DKIM and SPF; establish dual-approval procedure for all transfers exceeding $5,000; conduct BEC awareness training CISO 2026-03-31 4 In Progress
R-009 VPN / remote access portal Brute force attack on VPN credentials leading to network intrusion No account lockout policy on VPN; no MFA requirement on remote access 4 3 12 High Mitigate: enable account lockout after 5 failed attempts with 15-minute lockout; enforce MFA on VPN using hardware token or authenticator app IT Manager 2026-03-31 3 Complete
R-010 Backup systems and media Backup failure resulting in data being unrecoverable following an incident Backups not tested; no automated monitoring of backup job success or failure 3 4 12 High Mitigate: implement automated alerting on backup job failure; conduct monthly backup restore test with documented evidence; include backup status in weekly IT review IT Manager 2026-04-30 4 In Progress
R-011 Development environment and source code Credentials or API keys committed to public or private GitHub repository No secret scanning in CI/CD pipeline; no mandatory pre-commit hooks; developers unaware of risk 3 4 12 High Mitigate: implement GitGuardian or GitHub Advanced Security secret scanning on all repositories; enforce pre-commit hooks that block secrets; run awareness session for all developers Technical Director 2026-04-15 3 Planned
R-012 Key supplier β€” SIEM platform vendor Vendor breach exposing client log data stored or processed on vendor platform No security requirements in vendor contract; no Data Processing Agreement; no right to audit 2 5 10 High Mitigate: revise supplier contract to include minimum security obligations, DPA, incident notification within 72 hours, and right to audit or receive audit report; conduct annual security review Legal / CISO 2026-05-31 5 Planned
R-013 Internal office network Rogue device connected to internal network by visitor or unauthorised party No 802.1X network access control; guest and corporate Wi-Fi on same network segment 2 3 6 Medium Mitigate: implement network segmentation separating guest, corporate, and server VLANs; deploy 802.1X for wired connections; enforce device certificate requirement for corporate Wi-Fi IT Manager 2026-06-30 2 Planned
R-014 Penetration test reports in transit Report intercepted in transit to client, exposing client vulnerability data Reports delivered via unencrypted email attachments with no password protection 2 4 8 Medium Mitigate: mandate delivery via encrypted client portal (SharePoint with MFA); prohibit sending Confidential reports via standard email; update report delivery procedure and communicate to all consultants All Pentesters 2026-04-30 2 In Progress
R-015 Organisational continuity Key person dependency β€” loss of single skilled resource causes inability to deliver critical service No documented runbooks for critical processes; no cross-training; no succession plan for critical roles 3 3 9 Medium Mitigate: document all critical operational procedures as formal runbooks; identify and cross-train a second competent resource for each critical function; review and update annually CISO 2026-06-30 4 Planned

Risk Summary Dashboard

Count by Rating

Rating Total Risks Open In Progress Complete
Critical (15–25) 3 0 2 1
High (10–14) 7 0 4 2
Medium (5–9) 3 0 1 0
Low (1–4) 0 0 0 0
Planned 5 5 β€” β€”
Total 15 5 7 3

Note: β€œPlanned” risks have owners and target dates assigned but treatment has not yet commenced.

Risks Requiring Immediate Attention (Critical β€” not yet Complete)

ID Risk Description Owner Target Date Days Remaining
R-001 Ransomware / unpatched SOC platform SOC Manager 2026-04-30 47
R-003 AWS misconfiguration / no config scanning Cloud Lead 2026-04-15 32
R-008 BEC / no DMARC enforcement CISO 2026-03-31 17

Review History

Version Date Author Changes
1.0 March 2026 [ISM Name] Initial issue β€” 15 risks assessed

Need help implementing ISO 27001 or SOC 2?

Our certified team can guide you from gap assessment through to certification audit. Or browse the full template library.

Explore Compliance Consulting